Lift Fault: Entrance C

Jan 23, 2023

Lift H116 in Block C is out of order.

Lift engineers have been called out by Wandsworth Council (who are responsible for lift maintenance) and the lift will be back in service as soon as possible.

Update Jan 24, 2023

The Lift Section department in WBC have said that the Slam Post has come away and that repairs are required to secure the Slam Post. WBC have advised that Lift Engineers will be on site today to undertake the necessary repairs.

Update Jan 27, 2023

The positioning issue has been resolved and there is a secondary  fault with the car door operation. An engineer is expected to return today to further investigate this.

 

Sign up to get an email when there’s an important announcement from Goulden House.